CommunityData:Message Walls: Difference between revisions

From CommunityData
No edit summary
 
(45 intermediate revisions by 3 users not shown)
Line 3: Line 3:
* Notes on Wikia Dumps [[CommunityData:Wikia Dumps]]
* Notes on Wikia Dumps [[CommunityData:Wikia Dumps]]
* Notes on the code -- Now with a diagram! [[CommunityData:Message Walls Code]]
* Notes on the code -- Now with a diagram! [[CommunityData:Message Walls Code]]
= Robustness Checks =
* Pre-period matching placebo test
* Normal placebo test


= Task Management =  
= Task Management =  
Line 8: Line 12:
==Overview ==
==Overview ==


(last updated December 5)
(Updated March 15th)


===Data collection & analysis===
===Get missing wikis===
*Get missing wikis:
*'''ASAP''' Need to use wikilist3.csv to determine which wikis we don't have - Salt (with Mako's help)
** Sneha will use wikiList.3.csv to find which wikis we don't have.
*'''ASAP''' Download the rest and put them through wikiq and build edit weeks - Salt (with Mako's help)
**Sneha will email Mako the list, and he will ask the Spaniards whether they have them
 
** Collect any others we need
===Analysis===
*Gather data for all wikis that meet extreme minimal inclusion criteria
* Another meeting with full team to go over the results and try to make sense of them (after Sneha takes a first stab)
*Write down preliminary inclusion criteria.
* Determine any other models we want to run
*By Dec 12: Implement current inclusion criteria, ensure all variables are built as intended
*Dec 12 - 22: Complete initial version of results
*Dec 22 - Jan 5th: Generate models that we plan to report


===Writing===
===Writing===
*By Dec 15 - Convert draft of framing, literature review and methodology sections to ACM format
* Switch from Haythornwaite to Reader to Leader framing (Sneha)
*Week of Jan 8 - Check-in meeting to discuss preliminary results
* knitr integration (Sneha + Nate)
*By Jan 15 - Draft results section of the paper, identify changes to be made to framing/intro based on results
* plots (Salt)
*By Jan 31 - Complete first draft of paper
* Better pictures of message walls (Sneha)
* April 16 - CSCW abstract + metadata deadline
* Better explanations of why talk pages suck (Sneha)
* April 19 - CSCW submission deadline
* Zotero streamlining
 
==Next Steps (Nov 30)==
*(Nate) Update code diagram to say we're using wikiList.3.csv
*(Nate) Write python code to create training set
*(Nate and Salt) Link missing dumps to online dump sources
*(Sneha) Write R code for analyzing data at the edit weeks level


=== Archive ===
== Archive ==


* [[/Archived_tasks|Past next steps]]
* [[/Archived_tasks|Past next steps]]

Latest revision as of 19:31, 14 June 2018

Useful Resources[edit]

Robustness Checks[edit]

  • Pre-period matching placebo test
  • Normal placebo test

Task Management[edit]

Overview[edit]

(Updated March 15th)

Get missing wikis[edit]

  • ASAP Need to use wikilist3.csv to determine which wikis we don't have - Salt (with Mako's help)
  • ASAP Download the rest and put them through wikiq and build edit weeks - Salt (with Mako's help)

Analysis[edit]

  • Another meeting with full team to go over the results and try to make sense of them (after Sneha takes a first stab)
  • Determine any other models we want to run

Writing[edit]

  • Switch from Haythornwaite to Reader to Leader framing (Sneha)
  • knitr integration (Sneha + Nate)
  • plots (Salt)
  • Better pictures of message walls (Sneha)
  • Better explanations of why talk pages suck (Sneha)
  • Zotero streamlining

Archive[edit]